Update March 1, 2019

A number of houses in the back of the little neighborhood have yet to be demolished. Because of passage for heavy equipment, 9 of the 12 families cannot yet build their shelters permanently. It is possible that the sites will be rearranged.

This cottage (phase-1) is half-finished, and possibly still movable.
Meanwhile, the cottages of neighbor boys Jaren Boy and Jumar were completed.
Inside, it looks neat. Power is prepared, we are waiting for connection.